The UK Government directives and incentives, aimed at the
reduction of carbon emissions are now influencing the decisions of local
government authorities and industry; and Lämpöässä Finland, are fully
experienced in this specialist area.

The application and harnessing of GSHP energy in most cases offers
no barriers to its adoption. The initial capital cost, whilst not
inconsiderate for established buildings, does give medium to long term
benefits. It is however truly cost effective on new build projects and offers
boasts attractive 'pay back' projections.

During the past 25 years, Lämpöässä has acquired significant experience in
the system development, manufacture, and installation of these large scale
heat pump installations up to 500kW, and a selection of these can be seen
under our domestic, commercial and industrial case study pages.

Heat from the soil, bedrock or water system

Heat from the soil, bedrock or water system
1. Soil
Installation depth of the collector circuit pipe is between 1.0 to 1.2m Distance between the pipes is 1.5m.

2. Water system
The installation depth is a minimum of 2 to 3m. Due to the current, installation in a river is not recommemded. Weights of 4kg must be placed on the pipe every 2 metres.

3. Bedrock
Diameter 135 to 200 mm. The best and most common way is to drill an
energy bore, 165 mm with a 3 pipe system. The depth of the one bore is 100 to 200m.

Appointed distributors of
LAMPOASSA - GROUND SOURCE HEAT PUMPS SINCE 1983 www.lampoassa.fi

click here to download a version of Adobe Acrobat reader to view these files.

- Terms and conditions

- Printable Brochure

- Lampoassa adds Air to Water         Heatpumps to its established range         of energy saving heating products